42.25sqm Skimmer Type swimming pool, with 2.5 x 2.5 Jacuzzi and sliding WPC cover.
PROJECT OVERVIEW
What began as a pool project in Gen Trias, Cavite developed into a carefully coordinated swimming pool build documented from its early works through the latest visible stage.
The 42.25sqm Skimmer Type swimming pool, with 2.5 x 2.5 Jacuzzi and sliding WPC cover. project in, Cavite began with a clear objective: turn the available site and project requirements into a functional swimming pool built through an organized construction process. Its recorded status is Completed; the documented duration is 10 Weeks.
The recorded scope includes 42.25sqm Skimmer Type swimming pool, with 2.5 x 2.5 Jacuzzi and sliding WPC cover.
The completed result is presented as part of QPB’s project portfolio to show the documented construction journey and the quality of the finished work.
- Status
- Completed
- Duration
- 10 Weeks
CONSTRUCTION JOURNEY
How the project progressed.
The project contains 9 uploaded photos. Because the photos do not yet have clear stage labels or captions, this draft describes them only as a record of the project’s construction progress. Add stage labels or captions for a more specific journey.
PROJECT MEDIA
Project Progress Gallery
View the project from construction through completion. Every photo is shown in full without cropping.
BUILD WITH QPB
Request a QuotationLet’s discuss your pool project.
From concept and planning to construction, equipment, and turnover.