Ongoing Swimming Pool Construction
← Back to Projects
21 sqm Skimmer Type heated Swimming Pool
PROJECT OVERVIEW
This ongoing Skimmer Type project in, Alfonso, Cavite was planned and delivered by Quality Pool Builderz through coordinated structural, plumbing, finishing, and equipment works. The recorded project details include dimensions of 3.5m x 6.0m.
The **21 sqm Skimmer Type Heated Swimming Pool Project in Alfonso, Cavite** is an ongoing swimming pool construction project being undertaken by **Quality Pool Builderz (QPB)**. The project has progressed through a sequence of documented construction stages, creating a clear record of the work performed from the initial site activities through the succeeding phases of pool construction.
The swimming pool has confirmed dimensions of approximately **3.5 meters by 6.0 meters**, with a total surface area of around **21 square meters**. The approved scope of work covers the construction of a **skimmer-type heated swimming pool**, incorporating the necessary structural, plumbing, filtration, circulation, heating, electrical, waterproofing, and finishing components required for a complete and functional pool system.
Throughout the construction period, the project has been documented according to its actual site progress. These records provide visibility into the sequence of activities completed, the development of the pool structure, installation of essential systems, and preparation for the succeeding construction and finishing stages.
Particular attention is given to the proper integration of the pool’s **heating system with the circulation and filtration system**, ensuring that the completed swimming pool can operate efficiently while maintaining the intended water temperature and overall system performance.
The **Alfonso, Cavite project is currently recorded in the QPB Construction Management Platform (CMP) as Ongoing**. Remaining works will continue through the required construction, equipment installation, testing, finishing, commissioning, and turnover stages until the swimming pool is fully completed and ready for use.
- Status
- Ongoing
- Pool Type
- Skimmer Type
- Dimensions
- 3.5m x 6.0m
- Duration
- 2 weeks
CONSTRUCTION JOURNEY
How the project progressed.
The project photos present a visual record of the work as it progressed through its documented construction sequence. Together, they show the gradual development of the project from active site works toward the latest recorded stage.
PROJECT MEDIA
Project Progress Gallery
View the project from construction through completion. Every photo is shown in full without cropping.
BUILD WITH QPB
Request a QuotationLet’s discuss your pool project.
From concept and planning to construction, equipment, and turnover.